Utility Locating for Engineers, Geotech and Survey Firms

Borings cleared per point, sites marked ahead of survey, and a written record with GPS positions as KMZ or shapefile. Approximate horizontal position; the engineer of record assigns the quality level.

Two construction workers in safety gear, including helmets and vests, are walking and discussing plans at a construction site with a partially built multi-story building in the background
A construction worker wearing a white helmet and a tool belt stands with his back to the camera, observing a house under construction
Engineers, geotech and survey firms

Cleared borings, marked sites, and a record that holds up

Rig on site next week?

Send the boring plan or the site limits through the request form, or call or text (719) 800-4937. Firm number and a date before we mobilize.